Skip to content

15.5 km Long Single-Tube Road Tunnel in Austria

The tunnel tube with two-way traffic was partially rehabilitated and the electrical installations were completely overhauled.
Client:
n.a.
Location:
Austria
Time frame:
2013–2018
  • Single-tube tunnel with two-way traffic
  • Tunnel length: approx. 15.5 km
  • Ventilation shafts, height: 1 x 216 m and
    1 x 736 m
  • 19 existing and 8 new lay-bys
  • 5 new electrical equipment niches
  • 3 new power supply points
  • High-pressure water mist system
  • Management Consulting
  • Engineering
  • Project Management

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Contact Us

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

Explore Careers
15.5 km Long Single-Tube Road Tunnel in Austria