Skip to content

A9 Pyhrn Motorway, Wald Tunnel, Live Fire Tests

In addition to providing site supervision services for an approx. 2,850 m long twin-tube tunnel with a longitudinal ventilation system, ILF also performed live fire tests during tunnel commissioning.
Client:
ASFINAG Bau Management GmbH, Vienna
Location:
Austria
Time frame:
2015–2018
  • Twin-tube tunnel with one-way traffic
  • Length: approx. 2,850 m
  • Retrofitting of escape routes
  • Construction of additional emergency call and firefighting niches
  • Renewal and adaptation of power supply
  • Installation of high-pressure water mist system
  • Renewal of the tunnel ventilation system
  • Management Consulting
  • Engineering
  • Project Management

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Contact Us

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

Explore Careers
Live Fire Tests in a Road Tunnel in Austria