


Overview
Gotthard Base Tunnel
About the Project
- Client:
- AlpTransit Gotthard AG
- Location:
- Switzerland
- Time frame:
- 1996–ongoing
Technical Data
- Length: 57 km
- Excavation: NATM/TBM (Ø 9.58 m)
- Cross-passages (every 325 m)
- Rock overburden up to 2,300 m
ILF-Services
- Management Consulting
References







