


Overview
Modernization of Mittlerer Ring Road, Landshuter Allee
About the Project
- Client:
- City of Munich
- Location:
- Germany
- Time frame:
- 2016–ongoing
Technical Data
- Six-lane federal road, inner-city
- ADT > 100,000 vehicles
- Four-lane road tunnel, length: 1.45 km
- Main foul and storm water collectors
- 2 exhaust air shafts, noise barrier wall
- Traffic to be maintained
- Foul and storm water collection system to be kept operational during construction
ILF-Services
- Engineering
References







