


Overview
Stuttgart 21, Sections 1.2 and 1.6A
About the Project
- Client:
- DB Projekt Stuttgart-Ulm GmbH
- Location:
- Germany
- Time frame:
- 2010-ongoing
Technical Data
- 2 inner-city railway tunnels
- 2 single-track tubes with circular and partly arch profile
- Length: 9.5 km and 6.3 km
- Connecting structures
- > 100 m open line
- Trough, engineering and retaining structures
- Construction under railway operation
ILF-Services
- Project Management
References







