


Overview
Sulaibiya Wastewater Treatment and Reclamation Plant
About the Project
- Client:
- Philipp Holzmann - Kharafi Sulaibiya Joint Venture
- Location:
- Kuwait
- Time frame:
- 1998–2016
Technical Data
- Capacity: 375,000 m³/d
- Upgrade to 600,000 m³/d
- 2.5 million PE
- Wastewater feed pipeline: 25 km
- BOT implementation
ILF-Services
- Consulting Services
- Engineering and Design Services
- Procurement and Contracting Services
- Commissioning and Start-Up Services
- Project Management
References







