Kemerleng Hydropower Project

The services provided by ILF Consulting Engineers (Asia) started with a site survey to validate the original site conditions. Subsequently, preliminary concepts for the hydropower project were developed and the best alternative was selected using ILF's own software RENRisk™. The alternative study includes pre-dimensioning of the main structures, estimation of investment expenditures and financial evaluation, supplemented by Monte Carlo simulation.
ການປົກປ້ອງສະພາບອາກາດແລະ ພະລັງງານ
ລູກຄ້າ:
Akuo Energy Indonesia, Jakarta
ສະຖານທີ່:
Indonesia
ໄລຍະເວລາ:
2018 - 2019
  • Installed Capacity: 2 x 2.0 MW
  • Design Flow: 4.5 m3/s
  • Design head: 120 m
  • Headwork: Tyrolean Weir
  • Waterway: 2.2 km Concrete Lined Canal
  • Turbine: 2 Francis Turbines

  • f25910b2-b026-4fe1-8843-deeb76851e17
  • 01933e9e-2e1f-4c3a-b06b-5545a23edd6f
  • b4950f23-d563-4a07-8cc4-72f091a5343e

ຜົນສຳເລັດທີ່ພິສູດແລ້ວຈາກໂຄງການຕົວຈິງ

ສຳຫຼວດໂຄງການທີ່ຄັດເລືອກ ທີ່ສະແດງຄວາມຊ່ຽວຊານຂອງພວກເຮົາໃນການສົ່ງມອບວຽກງານພະລັງງານ ແລະ ໂຄງລ່າງພື້ນຖານທີ່ຊັບຊ້ອນທົ່ວໂລກ.

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.