ພາບລວມ
Kemerleng Hydropower Project
ກ່ຽວກັບໂຄງການ
- ລູກຄ້າ:
- Akuo Energy Indonesia, Jakarta
- ສະຖານທີ່:
- Indonesia
- ໄລຍະເວລາ:
- 2018 - 2019
ຂໍ້ມູນທາງເຕັກນິກ
- Installed Capacity: 2 x 2.0 MW
- Design Flow: 4.5 m3/s
- Design head: 120 m
- Headwork: Tyrolean Weir
- Waterway: 2.2 km Concrete Lined Canal
Turbine: 2 Francis Turbines
ບໍລິການ ILF
- f25910b2-b026-4fe1-8843-deeb76851e17
- 01933e9e-2e1f-4c3a-b06b-5545a23edd6f
- b4950f23-d563-4a07-8cc4-72f091a5343e