Lampunut Hydropower Project

The project is designed as a cascade scheme consisting of two power plants with a total installed capacity of approx. 6 MW and an average annual energy production of 26.6 GWh/a. The power plant will be developed in two stages. The downstream plant will be implemented first with a capacity of 4 MW, adapted to the energy demand of the local coal mine. The power plant includes an in-take structure with desander, about 2.8 km of free-flow canal and a powerhouse with 2 Francis turbines. The upstream power will be developed in a later stage of the project.
ການປົກປ້ອງສະພາບອາກາດແລະ ພະລັງງານ
ລູກຄ້າ:
PT Adaro Power
ສະຖານທີ່:
Indonesia
ໄລຍະເວລາ:
2020 - ongoing
  • Installed Capacity: 6 MW
  • Design flow: 3.5 m3/s
  • Net head: 110 m
  • Avg. Yearly Energy Generation: 18.603 GWh
  • Powerhouse units: 3x 1.07 MW each
  • f25910b2-b026-4fe1-8843-deeb76851e17
  • 01933e9e-2e1f-4c3a-b06b-5545a23edd6f

ຜົນສຳເລັດທີ່ພິສູດແລ້ວຈາກໂຄງການຕົວຈິງ

ສຳຫຼວດໂຄງການທີ່ຄັດເລືອກ ທີ່ສະແດງຄວາມຊ່ຽວຊານຂອງພວກເຮົາໃນການສົ່ງມອບວຽກງານພະລັງງານ ແລະ ໂຄງລ່າງພື້ນຖານທີ່ຊັບຊ້ອນທົ່ວໂລກ.

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.