
ພາບລວມ
Nam Bi Cascade Hydropower Project
ກ່ຽວກັບໂຄງການ
- ລູກຄ້າ:
- Confidential
- ສະຖານທີ່:
- Lao PDR
- ໄລຍະເວລາ:
- 2018 - 2019
ຂໍ້ມູນທາງເຕັກນິກ
- Installed Capacity: 52 MW, 71 MW and 12 MW
- Max. Design Flow: 31.1 m3/s, 23.7 m3/s and 13.2 m3/s
- Design head: 196.8 m, 348.3 m and 110.1 m
- Dam: Two concrete gravity dams and one earth fill dam (height 37.6 m, 55 m and 35.5 m)
- Powerhouse: 2 Francis, 2 Francis and 2 Francis (Hor.)
ບໍລິການ ILF
- f25910b2-b026-4fe1-8843-deeb76851e17
- 01933e9e-2e1f-4c3a-b06b-5545a23edd6f
ໂຄງການອ້າງອີງ

