As a result of ILF's redesign and Owner's Engineer con-tract for the Nam Emoun hydropower project, the scope was extended by an additional project which included the preparation and supervision of a physical hydraulic model for the main structures of the project:
ການປົກປ້ອງສະພາບອາກາດແລະ ພະລັງງານ
ລູກຄ້າ:
Confidential
ສະຖານທີ່:
Lao PDR
ໄລຍະເວລາ:
2019 - 2022
  • Installed Capacity: 131.5 MW
  • Design Flow: 37 m3/s
  • Design Head: 396.4 m
  • Headworks: 2 Gate weirs concrete weirs (height 28 m, crest length 45 m) with lateral intake
  • Waterway: Two converging pressurized tunnels with a total length of 20 km
  • Powerhouse: 2 x vertical Pelton turbines

  • f25910b2-b026-4fe1-8843-deeb76851e17
  • 01933e9e-2e1f-4c3a-b06b-5545a23edd6f

ຜົນສຳເລັດທີ່ພິສູດແລ້ວຈາກໂຄງການຕົວຈິງ

ສຳຫຼວດໂຄງການທີ່ຄັດເລືອກ ທີ່ສະແດງຄວາມຊ່ຽວຊານຂອງພວກເຮົາໃນການສົ່ງມອບວຽກງານພະລັງງານ ແລະ ໂຄງລ່າງພື້ນຖານທີ່ຊັບຊ້ອນທົ່ວໂລກ.

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.