Nam Ngiep 3A Hydropower Project
ກ່ຽວກັບໂຄງການ
- ລູກຄ້າ:
- Chaleun Sekong Group Co. Ltd., Laos
- ສະຖານທີ່:
- Lao PDR
- ໄລຍະເວລາ:
- 2015 - 2016
ຂໍ້ມູນທາງເຕັກນິກ
- Installed Capacity: 40 MW
- Design flow: 36.7 m3/s
- Waterway: 500 m, Open Channel and 500 m as a box culvert section
- Powerhouse: 3 vertical and 2 horizontal Francis turbines