Nam Ou 1 Hydropower Project
ກ່ຽວກັບໂຄງການ
- ລູກຄ້າ:
- Department of Energy Business (DEB), Ministry of Energy and Mines, Government of Laos
- ສະຖານທີ່:
- Lao PDR
- ໄລຍະເວລາ:
- 2017 - 2022
ຂໍ້ມູນທາງເຕັກນິກ
- Installed Capacity: 180 MW
- Design Flow: 1,308 m3/s
- Design head: 16 m
- Dam: Concrete dam with max. height of 51.9 m and 386 m crest length
Powerhouse: integrated in the dam, 4 x 45.92 MW
ບໍລິການ ILF