Nam Ou 3 Hydropower Project
ກ່ຽວກັບໂຄງການ
- ລູກຄ້າ:
- Department of Energy Business (DEB), Ministry of Energy and Mines, Government of Laos
- ສະຖານທີ່:
- Lao PDR
- ໄລຍະເວລາ:
- 2017 - 2022
ຂໍ້ມູນທາງເຕັກນິກ
- Installed Capacity: 210 MW
- Design Flow: 944.4 m3/s
- Design head: 26.5 m
- Dam: Concrete gravity with 58,5 m high, 256 m crest length
Powerhouse: 3 Kaplan turbines