ຂ້າມໄປຫາເນື້ອຫາ

Nam Ou 4 Hydropower Project

The Contract Engineer Services for the construction of the Nam Ou 4 Hydropower Project consisted of the inspection on site during construction, installation and commissioning, and was carried out by ILF on a periodic (mission) basis. The scope of the services included inspection and periodically monitoring the construction activities including Civil Works and Hydro-Mechanical and Electro-Mechanical Works.
ການປົກປ້ອງສະພາບອາກາດແລະ ພະລັງງານ
ລູກຄ້າ:
Department of Energy Business (DEB), Ministry of Energy and Mines, Government of Laos
ສະຖານທີ່:
Lao PDR
ໄລຍະເວລາ:
2017 - 2022
  • Installed Capacity: 137.4 MW
  • Design Flow: 666 m3/s
  • Design head: 23 m
  • Dam: Concrete gravity dam with a max. height of 51.5 m and a 296.5 m crest length
  • Powerhouse: 3 Bulb turbines

  • f25910b2-b026-4fe1-8843-deeb76851e17
  • 01933e9e-2e1f-4c3a-b06b-5545a23edd6f

ຜົນສຳເລັດທີ່ພິສູດແລ້ວຈາກໂຄງການຕົວຈິງ

ສຳຫຼວດໂຄງການທີ່ຄັດເລືອກ ທີ່ສະແດງຄວາມຊ່ຽວຊານຂອງພວກເຮົາໃນການສົ່ງມອບວຽກງານພະລັງງານ ແລະ ໂຄງລ່າງພື້ນຖານທີ່ຊັບຊ້ອນທົ່ວໂລກ.

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.