


Overview
Abu Dhabi Crude Oil Pipeline
About the Project
- Client:
- International Petroleum Investment Company (IPIC)
- Location:
- United Arab Emirates
- Time frame:
- 2007–2014
Technical Data
- Length: 403 km
- Diameter: 48”
- Pump discharge pressure: 90 bar
- Capacity: 1.5 mmbpd
- 2 pumping stations (total installed power: 68 MW),
terminal with 8 tanks,
working capacity: 160,000 m³/each,
loading facilities (total installed power:
32 MW) - 1 pressure reducing station
- Offshore loading lines 3 × 5 km
- 3 single point moorings
ILF-Services
- Management Consulting
- Project Management
- Engineering
References







