AL-Mu’Ajjiz Crude Oil Terminal
About the Project
- Client:
- JGC/Saudi Aramco
- Location:
- Saudi Arabia
- Time frame:
- 2015 - 2016
Technical Data
- 10 crude oil tanks à 170,000 m
- 10 x Crude oil tanks, each 1 MMBB
- Water content crude oil 0.15 – 0.5 ppm
- Water Intake: 1,600 m³/d
- TDS: 40,000 ppm
- Oil content. 100 – 500 ppm
- Impurity’s: Barium, Manganese, Ammonia
- Concept study for water treatment
Option 1: Discharge to the domestic WWTP
Option 2: Discharge to the evap. pond
Option 3: Discharge to the Red Sea
ILF-Services
- Management Consulting
- Engineering