Overview
High Speed Two (HS2) – Phase One
About the Project
- Client:
- High Speed Two Limited (HS2 Ltd)
- Time frame:
- 2020 - ongoing
Technical Data
- 225 km of track, including more than 50 km of tunnels and 16 km of viaducts
- Four new stations and two new depots
- 11 TBMs required for tunnel construction
- Bored tunnel internal diameter: 7.55–9.1 m
- Sprayed Concrete Lining (SCL) tunnels – excavated cross section: up to 140 m2
- SCL cavern – excavated cross section: over 160 m2
- Local dewatering, ground improvement and ground freezing required during tunnelling works
- Maximum tunnel overburden: 90 m
- Scheduled for completion in 2033
ILF-Services
- Management Consulting
- Project Management