


Overview
I-90 Road Tunnels in the USA; MBRT & MIT
About the Project
- Client:
- Ergosynch Engineering, USA
- Location:
- USA
- Time frame:
- 2015–2017
Technical Data
- Road tunnel with one-way traffic and
transverse ventilation system - First and second tube each with
a length of 1,040 m, 2 lanes per tube - Third tube with a length of 920 m, 3 levels, lower level with two lanes,
middle level with three lanes,
upper level for pedestrian and bicycle use - Combined ventilation systems
ILF-Services
- Management Consulting
- Engineering