Skip to content

Näfels Bypass Tunnel Project Manager

The Näfels bypass enables sustainable traffic relief for the town of Näfels by diverting through traffic via the 1.8 km Niederberg Tunnel and improving overall road safety.
Transportation & Urban SpacesRoadsTunnels
Client:
Schweizerische Eidgenossenschaft Bundesamt für Strassen ASTRA, Switzerland Winterthur Office
Location:
Switzerland
Time frame:
2023 – 2028
  • Total length of the bypass: approx. 2,845 m

  • Length of Niederberg Tunnel: 1,792 m

  • Tunnel Geology: various limestone formations, some of which are at risk of karstification

  • High projected water inflow: up to 1,000 l/s with water pressure of up to 10 bar acting on the pressure-resistant lining

  • Tunneling Method: Drill and blast method as well as excavation of soft rock using a pipe arch

  • Southward tunneling with a pilot tunnel for pre-drainage

  • Tunnel waterproofing: fully pressure-resistant waterproofing with lining

  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers