


Overview
Nuremberg–Ingolstadt Railway Line
About the Project
- Client:
- DB ProjektBau GmbH
- Location:
- Germany
- Time frame:
- 1991–2009
Technical Data
- Length: 74 km
- Design speed: 300 km/h
- Above-ground line section: 51.5 km
- 2 stations, 51 railway bridges
- 24 overpasses
- 8 tunnels (in total 25.8 km)
- 6.9 km of adits for emergency exits
- 11 shafts for emergency exits
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







