


Overview
Recovery of Salt from Road Runoff in Winter
About the Project
- Client:
- Autobahnen- und Schnellstraßen Finanzierungs-Aktiengesellschaft (ASFINAG)
- Location:
- Austria
- Time frame:
- 2021 - ongoing
Technical Data
- Feed: 1 m³/h
- Feed quality in mg/L; mean value
(Min – Max)
Chloride: 1.500 (300 – 3,000)
Sodium: 1.000 (200 – 2,000) - Effluent requirements:
Chloride in Permeate: max. 150 mg/L
Brine Salinity: 15% - 20%
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







