Skip to content

Through Station Luzern Subproject 3 Neustadt Tunnel

The Lucerne rail hub is at its limit. The Central Switzerland Corridor Framework Plan will increase capacity with an underground through station and the ~2.1 km long Neustadt Tunnel (TP3).
Transportation & Urban SpacesTunnels
Client:
SBB AG
Location:
Switzerland
Time frame:
2021 - 2022
        • NATM advance in 500 m of loose rock
        • 1,200 m in rock with roadheader
        • Two bifurcation caverns
        • Excavation cross-section: up to 144.2 m2
        • 200 m cut-and-cover tunnel
        • Two vertical emergency exits
        • Tunnel crossing underneath existing SBB access tunnel at Luzern railway station
  • Engineering

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers