Skip to content

Nam Ou 4 Hydropower Project

The Contract Engineer Services for the construction of the Nam Ou 4 Hydropower Project consisted of the inspection on site during construction, installation and commissioning, and was carried out by ILF on a periodic (mission) basis. The scope of the services included inspection and periodically monitoring the construction activities including Civil Works and Hydro-Mechanical and Electro-Mechanical Works.
Energy & Climate Protection
Client:
Department of Energy Business (DEB), Ministry of Energy and Mines, Government of Laos
Location:
Lao PDR
Time frame:
2017 - 2022
  • Installed Capacity: 137.4 MW
  • Design Flow: 666 m3/s
  • Design head: 23 m
  • Dam: Concrete gravity dam with a max. height of 51.5 m and a 296.5 m crest length
  • Powerhouse: 3 Bulb turbines

  • Management Consulting
  • Engineering

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Nam Ou 4 Hydropower Project