Overview
Xekong 4A & 4B Hydropower Project
About the Project
- Client:
- Ministry of Energy and Mines (DEM), Government of Lao PDR
- Location:
- Lao PDR
- Time frame:
- 2021 - ongoing
Technical Data
- Installed Capacity: 175 MW & 180 MW
- Project type: 2 Storage Hydroelectric Power Plants
- Design Flow: 161.8 / 81.0 m3/s & 116.65 m3/s
- Net Head: 59.5 m & 88.4 m
- Powerhouse: 2 x Vertical Francis turbines
ILF-Services
- Management Consulting
- Engineering
References