
Overview
Al Yassat Island Hybrid Power Plant
About the Project
- Client:
- Dubai Electricity and Water Authority (DEWA)
- Location:
- United Arab Emirates
- Time frame:
- 2013
Technical Data
- Diesel power plant: 4 MW
- MV grid: 11 kV
- PV power plant: 0.8 to 3.0 MW
- Wind power plant: 0.6 to 1.5 MW
- Battery storage: up to 8 MWh/2 MW
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







