Overview
Kemerleng Hydropower Project
About the Project
- Client:
- Akuo Energy Indonesia, Jakarta
- Location:
- Indonesia
- Time frame:
- 2018 - 2019
Technical Data
- Installed Capacity: 2 x 2.0 MW
- Design Flow: 4.5 m3/s
- Design head: 120 m
- Headwork: Tyrolean Weir
- Waterway: 2.2 km Concrete Lined Canal
Turbine: 2 Francis Turbines
ILF-Services
- Management Consulting
- Engineering
- Project Management