
Overview
Nam Ou 4 Hydropower Project
About the Project
- Client:
- Department of Energy Business (DEB), Ministry of Energy and Mines, Government of Laos
- Location:
- Lao PDR
- Time frame:
- 2017 - 2022
Technical Data
- Installed Capacity: 137.4 MW
- Design Flow: 666 m3/s
- Design head: 23 m
- Dam: Concrete gravity dam with a max. height of 51.5 m and a 296.5 m crest length
Powerhouse: 3 Bulb turbines
ILF-Services
- Management Consulting
- Engineering
References







