SuedLink 2.0, High-Voltage Direct Current (HVDC) Transmission Line

In the course of the ongoing energy transition and the planned nuclear phase-out, a balance has to be established between an excess of wind energy in the north of Germany and a lack of electric energy at large consumer centers in the south of Germany (Baden-Württemberg and Bavaria).
Energy & Climate ProtectionPower Transmission & Distribution
Client:
TenneT TSO GmbH, TransnetBW GmbH
Location:
Germany
Time frame:
2016–ongoing
  • Direct current transmission from Schleswig-Holstein (Brunsbüttel and Wilster) to Baden-Württemberg (Großgartach) and Bavaria (Grafenrheinfeld) using buried HVDC cables
  • Voltage level: up to 525 kV
  • Length: approx. 500 + 700 km
  • Transmission capacity: 2 x 2 GW
  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    SuedLink 2.0, High-Voltage Direct Current (HVDC) Transmission