Overview
Nam Ngiep 3A Hydropower Project
About the Project
- Client:
- Chaleun Sekong Group Co. Ltd., Laos
- Location:
- Lao PDR
- Time frame:
- 2015 - 2016
Technical Data
- Installed Capacity: 40 MW
- Design flow: 36.7 m3/s
- Waterway: 500 m, Open Channel and 500 m as a box culvert section
- Powerhouse: 3 vertical and 2 horizontal Francis turbines
ILF-Services
- Management Consulting
- Engineering
References