
Overview
Nam Ou 1 Hydropower Project
About the Project
- Client:
- Department of Energy Business (DEB), Ministry of Energy and Mines, Government of Laos
- Location:
- Lao PDR
- Time frame:
- 2017 - 2022
Technical Data
- Installed Capacity: 180 MW
- Design Flow: 1,308 m3/s
- Design head: 16 m
- Dam: Concrete dam with max. height of 51.9 m and 386 m crest length
Powerhouse: integrated in the dam, 4 x 45.92 MW
ILF-Services
- Management Consulting
- Engineering
References







