
Overview
Sindangan (Siayan 1) Hydropower Project
About the Project
- Client:
- Alsons Energy Development Corporation
- Location:
- Philippines
- Time frame:
- 2021 - ongoing
Technical Data
- Installed Capacity: 7.8 MW
- Design Flow: 5.77 m3/s
- Net Head: 157.22 m
- Avg. Yearly Energy Generation: 35.80 GWh
ILF-Services
- Engineering
- Project Management
References







