Skip to content

15.5 km Long Single-Tube Road Tunnel in Austria

The tunnel tube with two-way traffic was partially rehabilitated and the electrical installations were completely overhauled.
Client:
n.a.
Location:
Austria
Time frame:
2013–2018
  • Single-tube tunnel with two-way traffic
  • Tunnel length: approx. 15.5 km
  • Ventilation shafts, height: 1 x 216 m and
    1 x 736 m
  • 19 existing and 8 new lay-bys
  • 5 new electrical equipment niches
  • 3 new power supply points
  • High-pressure water mist system
  • Management Consulting
  • Engineering
  • Project Management

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Contact Us

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

Explore Careers