System Optimisation of Gas Transmission Pipelines

2026 · World Pipelines, Volume 26 Number 5 - May 2026

Michael Kalsch, ILF Consulting Engineers

Geotechnical Modeling and Analysis of Surcharge Loading Combined with Geosynthetic-Encased Stone Columns

2026

Grace Stapley, Beatrice Beker, Frank Remmert - ILF Consulting Engineers

Numerical Modeling of Circular and Rectangular Shafts During Excavation and Microtunneling: Assessing the Impact of Jacking Forces on Structural Stability

2026

Roshanak Shafieiganjeh, Grace Stapley, Frank Remmert - ILF Consulting Engineers

ILF and FFUN SDG: Strategic Partnership in the Field of Sustainable Development

2026 · KAZSERVICE (2026). Journal about Oilfield Service Business in Kazakhstan, No. 1 (48), January–March. Association of Oil Service Companies of Kazakhstan.

Anastassiya Rueckert, ILF Consulting Engineers

Strengthening Local Expertise: How ILF Develops the Next Generation of Engineers in Kazakhstan

2026 · Petroleum Magazine, April 2026, p.32-39

Anastassiya Rueckert, ILF Consulting Engineers

Festschrift Zehn Jahre Adolf Feizlmayr-Stiftung (2015–2025)

2025

Adolf H. Feizlmayr (ILF Mitbegründer)

Optimization of surge tank and waterway design for the 750 MW Cethana pumped-storage scheme

2025

Matthias Saurwein - ILF Consulting Engineers / Wolfgang Richter, Misagh Moradali - Graz University of Technology

Optimizing dam design for the Khaishura hydropower project: A parametric approach

2025

Robert Klar, Ulrich Beikircher, Marc Gillmer - ILF Consutling Engineers / Julian Levy - Razgal Energy Ltd.

Unlocking the Hydrogen Economy: How Common User Infrastructure drives Project Bankability

2025 · Dii

Chiara Aruffo, Dii Desert Energy / Cornelius Matthes, Dii Desert Energy / Alex Sarac, Addleshaw Goddard / Prateek Banerjee, ILF Consulting Engineers

Project Excerpt: Green Hydrogen Common Infrastructure Development in Jordan

2025

ILF - Management Consulting | Energy and Climate Protection

Hydrogen’s Tipping Point

2025 · World Pipelines / March 2025

Kimberly Sari, ILF Consulting Engineers

Navigating the African-Atlantic Gas Pipeline project

2025 · World Pipelines / February 2025

Andreas Hausmann (ILF)

Mitigating the Champagne Effect: Novel Intake Structure Design for Advanced-CAES Energy Storage in Australia

2024

Robert Klar, Isabel Mora Robles, Reinhard Fritzer, - ILF Consulting Engineers / David Brown, Andrew McGillis - Hydrostor

Advanced technologies for a safe evacuation at the underground rescue point of the railway Koralm tunnel

2024 · (c)ISAVFT Ltd., Copenhagen 28th-30th Oct. 2024

F. Diernhofer, ILF Consulting Engineers Austria GmbH, Austria; H. Steiner, ÖBB- Infrastruktur AG, Austrian Federal Railways, Austria; M. Bacher, Graz University of Technology, Austria

Hydrogen Powered Vehicles in a Tunnel Incident – Risks and Consequences

2024 · 12 th International Conference ‘Tunnel Safety and Ventilation’ 2024, Graz

O. Heger, R.Schmidt (ILF), M. Aggarwal, P.Pertl, A. Trattner, D. Fruhwirt, P.Fößleitner

Interactions between Safety, Maintenance and Repair in Long, Deep-Lying, High-Speed Railway Tunnels, using the Example of the Koralm Tunnel

2023 · (c)WTC 2023: Expanding Underground Knowledge & Passion to Make a Positive Impact on the World

F. Diernhofer ILF Consulting Engineers Austria GmbH, Austria H. Steiner ÖBB Austrian Federal Railways, Austria

Effect of Pipes Used as Advance Support Measure on the Development of Load-Bearing Ring of Soil

2023 · International Society for Soil Mechanics and Geotechnical Engineering

B. Schneider-Muntau (University of Innsbruck-AUT), I. Bathaeian (ILF)

Strengthening of concrete structures – Today’s green solution for upcoming engineering challenges

2022 · 13th CCC Zakopane

M. Spiegl; R. Feldbacher; M. Öhrlein

Case Study of Multi-Period MILP HENS with Heat Pump and Storage Options for the Application in Energy Intensive Industries

2021 · MDPI : https://doi.org/10.3390/en14206741

Leopold Prendl; René Hofmann

The Sivas Gypsum Karst – Implications for Routing, Construction and Operation of the Trans Anatolian Natural Gas Pipeline

2021 · Pipeline Technology Journal 03/21

Klaus Robl, Alper Taşdemir, Ahmet Şaşmaz

Integritätsbewertung für die Sanierung einer Pipeline in Osteuropa

2011 · 3R International, 10-2011, Seite 748-750

M. Rieder, A. Louwerse

Decisive Parameters for the Design of Power Plant Caverns

2011 · ÖGG Tagung

E. Saurer, T. Marcher

The new RVS 09.01.42 (Tunnel structures in soft soil under built-up areas), Design Concept and Benchmark

2011 · ÖGG Tagung

M. Brandtner, M. Hofmann, P. Hölzl, E. Saurer, H. Walter

Grid space optimization of jet grouting columns

2011 · 15th European Conference on Soil Mechanics and Geotechnical Engineering, Athen / Griechenland, 12. - 15. September 2011, Seite 1055 - 1060, Copyright 2011, with permission from IOS Press

E. Saurer, T. Marcher, M. Lesnik

Innovations and Technological Developments in Long Distance Water Transmission Systems

2011 · 3R Special-Edition, Heft 2/2011, Seite 15-19

B. Lässer, A. Heinz

Distributed Fibre Optic Sensing Enhances Pipeline Safety and Security

2011 · OIL GAS European Magazine, 3/2011, Seite 132-136

J. Frings, T. Walk

Knowledge is Power

2011 · World Pipelines, Vol. 11, No. 9, Sept. 2011, Seite 28-32

A. Louwerse, M. Rieder

The Future of Pipeline Industry; Design of Safe, Reliable and Economic CO2 Pipeline Transportation Systems; Special Considerations Related to the QRA of Gas Transmission Pipelines

2011 · 3R International, Special 1/2011, Seiten 1, 45-49, 59-63

A.H. Feizlmayr, Dr. K.-D. Kaufmann, Dr. U. Neunert

A new dual fluidized bed gasifier design for improved in situ conversion of hydrocarbons

2011 · ICPS 2011 - International Conference on Polygeneration Strategies, Vienna, 2011

J. Schmid, C. Pfeifer, H. Kitzler, T. Pröll, H. Hofbauer

Determination of Load-Sharing Effects in Sprayed Concrete Tunnel Linings

2011 · Underground Construction 2011, Conference and Exhibition, Incorporating the International Tunnelling Exhibition, 29th and 30th June 2011 Earls Court, London, UK

T. Marcher, M. John, M. Ristic

Next Generation Biomass Gasifier

2011 · 19th European Biomass Conference and Exhibition 2011

C. Pfeifer, J. Schmid, T. Pröll, H. Hofbauer

Viel Zeit gespart

2011 · Erneuerbare Energien, Juli 2011, Seite 84-87

Th. Hofer

Einflussfaktoren auf die Erddruckverteilung bei eingeschütteten Tunneln

2011 · Baustatik-Baupraxis 11, Fachtagung der Lehrstühle und Institute für Statik, Universität Innsbruck / TU Graz, 2011

A. Kirsch, B. Mattle

Risk Analysis Karawanken Tunnel – an extended application of the Austrian Risk Model TuRisMo

2011 · 6th International Conference

B. Kohl, M. Zibert, G. Rattei

Results of a comparative application of QRA methodology for road tunnels in Germany

2011 · 6th International Conference

C. Neumann, C. Sistenich

Biomasse‐Dampfvergaser der zweiten Generation

2011 · Klima- und Energiefond, Endbericht G-volution, Seite 1 - 38, 2011

J. Schmid, T. Pröll, I. Diaz, C. Hafner, K. Jörg, C.Pfeifer, H. Hofbauer

Improvement of gas-solid interaction in dual circulating fluidized bed systems

2011 · Conference Paper; 9th European Conference on Industrial Furnaces and Boilers, Portugal 2011

J. Schmid, T. Pröll, C. Pfeifer, H. Hofbauer

Pipelines – Adern der Wirtschaft

2011 · Erdöl Erdgas Kohle 2011, Heft 2, Seite 63-67

A.H. Feizlmayr, S. Göstl

Abwärmenutzungsanlagen von Erdgasverdichterstationen zur Stromerzeugung als zukunftsweisende Technik / Technology for the future: Systems for recovery of waste heat from natural gas compressor stations for use in power generation

2010 · 3R International, Sonderausgabe Heft 1/2010, Seite 41 - 45, 2010

G. Kulhanek, M. Kovacik

Risk analysis study for Slovenian motorway tunnels

2010 · 10. Slovenski kongres o Cestah in Prometu, Portoroz (Slowenischer Verkehrskongress), 20.-22. Oktober, 2010

B. Kohl, M. Zibert

Optimized copper alloy tubing configuration for a multi-stage flash distiller

2010 · Desalination and Water Treatment, Heft 22, Seite 299 - 310, 2010

A. Trostmann, O. Morin

Optische Sensoren zur Gefährdungserkennung für Rohrleitungen

2010 · bbr 11/2010, Seite 18-25

T. Walk, J. Frings

Pipeline Leak Detection using Distributed Fiber Optic Sensing

2010 · 3R International, Special Edition - 2/2010, Seite 57 - 61

T. Walk, J. Frings

Risk Assessment of Transport for Dangerous Goods in Austrian Road Tunnels

2010 · Fourth International Symposium on Tunnel Safety and Security in Frankfurt am Main / Germany, Seite 93 - 102, 2010

F. Diernhofer, B. Kohl, R. Hörhan

Fiber optic sensing can help reduce third-party threats

2010 · Oil & Gas Journal, Volume 108 Issue 33, Sept. 06/2010

T. Walk, J. Frings

CO2 Pipelines – Conclusion: Impurity types, concentration influence hydraulic design

2010 · Oil & Gas Journal, April 2010, Seite 60 - 63

Dr. K.-D. Kaufmann

CO2 Pipelines – 1: Study details methods for determining steady-state pressure, temperature

2010 · Oil & Gas Journal, April 2010, Seite 39 - 47

Dr. K.-D. Kaufmann

Safety Management for Austrian Railway Tunnels

2010 · 5th International Conference

C. Neumann, B. Flößleitner

Sicherheitstechnische Nachrüstung des Arlberg-Eisenbahntunnels Konzepte, Maßnahmen und Erfahrungen

2010 · Bahn-Brandschutz, V. Internationales Fachsymposium in Wien, ifv Bahntechnik, 2010

C. Neumann

Contracting Strategies in thee oil and gas industry

2010 · 3R International, Special Edition - 1/2010, Seite 33 - 36

C. Schramm, A. Meißner, G. Weidinger

Betrachtung der Wärmefreisetzung im Brandfall

2010 · Bundesministeriums für Verkehr, Innovation und Technologie, 2010

P. Sturm, B. Höpperger

Challenges of Revamping Leixoes Oil Terminal, Portugal

2010 · 3R International, Special Edition 1/2010, Seite 37 - 41

L. Knowles, P. Flammang, U. Jungclaussen

New Austrian Guideline for the Transport of Dangerous Goods through Road Tunnels

2010 · 5th International Conference

F. Diernhofer, B. Kohl, R. Hörhan

Die neue Kläranlage für Warschau

2010 · Österreichische Vereinigung für Beton- und Bautechnik, Betontag 2010, Seite 25 - 29, 2010

K. Schmid

Modeling the impact of using multi-port RO pressure vessels in seawater reverse osmosis desalination plants using special simulation software

2009 · Desalination and Water Treatment Heft 5, Seite 192–197, 2009

M. Verhuelsdonk, T. Attenborough, O. Lex, T. Altmann

Notfallkonzepte für österreichische Eisenbahntunnel

2009 · Bahn-Brandschutz, IV. Internationales Fachsymposium in Berlin, ifv Bahntechnik, 2009

C. Neumann, C. Sommerlechner

Projektierung und Ausschreibung der 2. Röhre des Pfändertunnels

2009 · Tunnel, Heft 6/2009, Seite 19 - 29, 2009

G. Pilser, M. John, O. Alber

Die Innbrücke der Innsbrucker Nordkettenbahn Neu – Entwurf und Ausführung

2009 · Innsbruck - Massivbau und Brückenbau, Band 3, Seite 119 - 130, 2009

K. Schmid

Agradación y degradación del río Piura – realineamiento del cauce principal inferior, fenómeno El Niño, Perú

2008 · Ingeniería Hidráulica en México, Vol. XXIII, no. 3, July-September, Seite 5-28, ISSN-0186-4706, 2008

C. Alvarado-Ancieta, B. Ettmer

Schwallreduzierung durch Zwischenbecken bei Speicherkraftwerken / Surge Reduction Through Intermediate basins in Hydro-Storage Schemes

2008 · Österreichische Wasser- und Abfallwirtschaft, Heft 3-4, Seite 65 - 72, 2008, Rechteinhaber: Springer-Verlag; (DOI 10.1007/ s00506-008-0153-2)

W. Widmann

Tunnel Safety Concept Koralm Tunnel

2008 · Geomechanik und Tunnelbau, 1. Jahrgang, Heft 4, Seite 264-270, 2008

C. Neumann, F. Diernhöfer, C. Sommerlechner, M. Burghart

Rehabilitation und Erweiterung der Wasserver- und Abwasserentsorgung in Korca (Albanien)

2008 · Fachmagazin für Brunnen- und Leitungsbau (bbr), Heft 4, Seite 26 - 33, 2008

W. Haibach, T. Reinheimer, T. Fritz

Tunnel safety – do we behave in the right manner?

2008 · eurotransport, Heft 3, Seite 42-45, 2008

B. Kohl

Incident management in a very long railway tunnel

2008

C. Neumann, R. Bopp, G. Harer, M. Burghart, J. Koinig

Controlled emergency shutdown procedures aid crude line safety

2007 · Oil & Gas Journal, Volume 105 Issue 46, Dec. 10/2007

T. Walk

Energy from Hydropower

2007 · ECI Conference

R. Pöttler

Geohazards – Cost Hazards A new method for evaluation of risks in underground structures

2007 · ECI Conference

R. Pöttler, H. F. Schweiger, G. Peschl

Austrian Risk Analysis for Road Tunnels – Development of a New Method for the Risk Assessment of Road Tunnels

2007 · International Conference

K. Botschek, B. Kohl, R. Hörhan

Koralm Tunnel – Development of Tunnel System Design and Safety Concept

2007 · International Conference

C. Neumann, F. Diernhofer, G. Harer, J. Koinig

Wie passen Tunnelsicherheitsmaßnahmen zu den Rahmenbedingungen der Eisenbahn?

2007 · ÖGG - Fachseminar, Seite 1-6, 2007

C. Neumann, C. Sommerlechner

Risk Analyses for Road Tunnels – Light at the end of the tunnel?

2007 · Eurotransport, Heft 4, Seite 35-40, 2007

B. Kohl

Bestimmung des Einflusses von Karststrukturen auf die dauerhafte Stand- und Betriebssicherheit von Verkehrstunneln durch 3D-Finite-Element-Modellierung

2007 · Bautechnik, Heft 2, Seite 103-112, 2007

R. Pöttler, A. Spiegl

Austrian Risk Analysis for Road Tunnels – Development of a new Method for the Risk Assessment of Road Tunnels

2006 · 3rd International Conference

B. Kohl, K. Botschek, R. Hörhan

Emergency Exercises in Austrian Railway Tunnels

2006 · 3rd International Conference

C. Neumann, C. Sommerlechner, R. Valo

Erweiterung der Schneeanlage Ahorn

2006 · Mountain Manager, Heft 3, Seite 53, 2006

A. Speckl

Der Tunnel Vomp-Terfens – Von der Variantenstudie bis zur Bauausführung / Tunnel Vomp-Terfens – From Investigations of Alternatives in Construction Phase

2005 · Felsbau, Heft 6, Seite 83-89, 2005

S. Eder, G. Poscher, M. Köhler, M. Scholz

Anregung zur Abwicklung von Vergabeverfahren / Proposals for Contract Award Procedures

2005 · Felsbau, Heft 5, Seite 172-177, 2005

R. Pöttler, N. Ayaydin, K. Mussger

Lösung schwieriger Planungsaufgaben für den Strenger Tunnel / Solution of Difficult Aspects for the Strenger Tunnel

2004 · Felsbau, Heft 1, Seite 18-24, 2004

M. John, D. Spöndlin, B. Mattle

Geotechnische Planung der Voreinschnitte Ost Strenger Tunnel / Geotechnical Design of the Open Cut for the Eastern Portal of the Tunnel Strengen

2004 · Felsbau, Heft 1, Seite 30-32, 2004

D. Spöndlin, M. John

Self Rescue in the Wienerwald Tunnel

2003 · Safety in Road and Rail Tunnels, Seite 523-535, 2003

B. Kohl, C. Neumann, G. M. Vavrovsky

Upgrading of safety measures in the Arlberg Railway Tunnel: Construction of escape routes with cross-passages to the Arlberg Road Tunnel

2003 · Safety in Road and Rail Tunnels, Seite 81-90, 2003

C. Neumann, H. Wehr

Empfehlung für Planung und Bau von Verkehrswegen in karst- und erdfallgefährdeten Gebieten / Recommendation for the Design and Construction of Traffic Routes in Karst- Geology

2003 · Felsbau, Heft 1, Seite 8-12, 2003

R. Pöttler, P. Wegerer

Baugrunderkundung für Verkehrswege in Karstgebieten

2003 · Felsbau, Heft 1, Seite 13-21, 2003

S. Eder, M. Plank, K-D. Höwing

Grundkonzept zur Lösung der Karst- und Erdfallproblematik für den Bau von Verkehrswegen / Basic Concept for Solving Karst and Sinkhole Problems in the Course of Traffic Routes

2002 · Felsbau, Heft 3, Seite 10-21, 2002

R. Pöttler, F. Schneider, E. Rehfeld, H. Quick

Tunnel Heading Stability in Drained Ground / Standsicherheit der Ortsbrust von Tunneln unter dränierten Baugrundbedingungen

2002 · Felsbau, Heft 6, Seite 8-24, 2002

T. Marcher, Nico Ruse, P. A. Vermeer

Numerical Simulation of Excavating the Overburden Above a Masonry Tunnel / Abtragung der Überlagerung über einen gemauerten Tunnel – numerische Simulation

2002 · Felsbau, Heft 6, Seite 35-41, 2002

B. Mattle, C. Weigl, J. Benedikt

Sicherheitsdefiniton im Tunnelbau – Wie praxisbezogen ist die Theorie? / Safety factors in tunneling – How works the theory in practice?

1999 · Felsbau, Heft 5, Seite 452-459, 1999

R. Pöttler, H.F. Schweiger, R. Thurner, M. John

The Perfect Blend ? The impact of hydrogen blending on the transport capacity of natural gas pipelines

2021 · World Pipelines / June 2021

Michael Kasch

Scaling up green hydrogen in Europe

2021 · Webinar Scaling up green hydrogen in Europe, February 26, 2021

M. Erath, J. Kottsieper, M. Watzal, C. July, A. Brown, E. Fournis, D. Drury

Simultaneous integration of heat pumps and different thermal energy storages into a tightened multi-period MILP HENS superstructure formulation for industrial applications

2021 · Computers and Chemical Engineering 147 (2021) 107237

L. Prendl, K. Schenzel, R. Hofmann

What Can We Learn from Comparing Glacio-Hydrological Models?

2020 · Atmosphere 2020, 11, 981; doi:10.3390/atmos11090981

E. Stoll, F. Hanzer, F. Oesterle, J. Nemec, J. Schöber, M. Huttenlau, K. Förster

The impact of insufficient hydropower plant safety: A case study

2020 · Hydropower & Dams, Issue Five, page 68-72, 2020

M. Schwarzkopf

Managing the EPC-PMC Matrix

2020 · World Pipelines, May 2020

J. Schlor, P. Zelenicka, M. Wagner

Bikepark Innsbruck – Alpines Bike-Dorado mit urbanem Feeling

2020 · SI - Seilbahnen International 7/2020

A new standard in the sustainable development of human habitat: The Red Sea Project

2020 · GHORFA Yearbook 2020, page 42-46

G. La Porta

Earthquake in Papua New Guinea Results in New Concept for Securing Pipelines in Ridgeline-Right-of-Way: The Micropile continguous Wall

2020 · International Pipeline Conference 2020

C. Ladenhauf

Kitzsteinhorn – Modernste Technik unter ewigem Eis

2020 · SI - Seilbahn International 6/2020, page 72-73

Seilbahn & Digitale Stadtplanung – Digitalisierung in der Stadtentwicklung aus der Sicht von ILF Consulting Engineers

2020 · SI Urban, issue 2/2020

H. Greiner, A. Nirnberger, S. Schandl, K. Wiedenhofer-Petak

Multidisciplinary landslide assessment – a systematic and practicable approach for pipeline projects

2020 · 15th Pipeline Technology Conference 2020, Berlin

C. Prager, C. Ladenhauf, L. Schwarz, T. Strauhal, S. Unterrader

Digitalization in Industry – An Austrian Perspective

2020 · Climate and Energy Fund of the Austrian Federal Government, https://sic.tuwien.ac.at/aktuelles/news_detail/article/11118/DE/

R. Hofmann, V. Halmschlager, S. Knöttner, B. Leitner, D. Pernsteiner, L. Prendl, C. Sejkora, G. Steindl, A. Traupmann

Safety Systems Selection

2020 · www.engineerlive.com, page 50-51

R. Poljak

Field Investigation on Hydroabrasion in High-Speed Sediment-Laden Flows at Sediment Bypass Tunnels

2020 · Water 2020, 12(2), 469

M. Müller-Hagmann, I. Albayrak, C. Auel, R.M. Boes

Numerically obtained vortices in granular media

2019 · International Journal for Numerical and Analytical Methods in Geomechanics · August 2019

D. Kolymbas, I. Bathaeian

Großprojekt S21: Verzweigungsbauwerk Kriegsberg im Tunnel Bad Cannstatt – Außenschalenverstärkung, Bewehrungsmaßnahmen, dauerhafte Außenschale

2019 · STUVA-Tagung 2019, Forschung und Praxis 53

S. Höser, ARGE Tunnel Cannstatt

Challenge of maintaining the Koralm Tunnel – Balancing operational availability and increasing railway equipment

2019 · Geomechanics and Tunneling 6, Volume 12, December 2019 (ISSN 1865-7362)

F. Diernhofer, K. Schneider, H. Steiner

The Bigger Picture

2019 · World Pipelines, December 2019

S. Seidl

Beschleunigte Projektvorbereitung in Afrika

2019 · Beratende Ingenieure · 11|12 2019, page 45-47

J. Kottsieper

Analytical Algorithms

2019 · World Pipelines, June 2019

M. Barth, M. Kasch

Web-GIS-basierte Bürgerbeteiligung bei Großprojekten

2019 · gis@work 2/2019, page 20-21

W. Wakolbinger, J. Rein

Pipeline integrity subjected to large seismic induced PGD

2019 · 2nd International Conference on Natural Hazards & Infrastructure (ICONHIC), 23-26 June 2019, Chania, Greece

R. Ofner, M. Katsoulis

Power from Pipelines

2019 · https://www.engineerlive.com, page 35-36, 2019

T. Rother

Integrated Protection and Detection

2019 · World Pipelines / Extreme, 2019

F. Beyer

Eppenberg Tunnel: Soft Ground Drive and Inner Lining / Eppenbergtunnel: Lockergesteinsvortrieb und Innenausbau

2019 · https://www.tunnel-online.info/de/archiv.html

Heiko Atzbacher, Nathaniel Coupy, Stephan Eitel, Gabriele Pagliari,

Risk Assessment as a tool for decision making to improve tunnel safety

2019 · VII Simposio de Túneles de Carretera, Barcelona/Spain, February 2019

B. Kohl

Renewable Energy VBI-Guide

2019 · Verband Beratender Ingenieure VBI, Second Issue, Feber 2019

A. Feizlmayr, R. Fritzer, M. Kneller, J. Kottsieper, H,. Neumeister, S. Rauer, M. Seidenkranz, M. Watzal, W. Wakolbinger

Neubewertung des Hochwasserrisikos unter zukünftigen Klima- und Landnutzungsänderungen

2019 · 20. Österreichischer Klimatag 2019, Wien (Poster-Präsentation)

K. Schneeberger, B. Winter, C. Georges, R. Pazur, M. Huttenlau, S. Achleitner, J. Bolliger

Interview with Bruno Mattle in “bau aktuell”

2019 · bau aktuell, Issue 02/2019, page 44-45, www.bauaktuell.at

Dipl.-Ing. Dr. techn. M. Spiegl

Risk Assessment as a tool for decision making to improve tunnel safety

2019 · PIARC Technical Committee D.5 “Road Tunnel Operations”, 2019

B. Kohl

Upgrading of the railway line Vienna/Stadlau – Bratislava in Austria as part of the Baltic-Adriatic Corridor

2019 · Rail Forum Bratislava, 19.-20. March, 2019

F. Bachl, B. Kohl, J. Paar

A continuous modelling approach for design flood estimation on sub-daily time scale

2019 · Hydrological Sciences Journal, 2019

B. Winter, K. Schneeberger, N.V. Dung, M. Huttenlau, S. Achleitner, J. Stötter, B. Merz, S. Vorogushyn

Eppenbergtunnel: Herzstück des vierspurigen Ausbaus Olten – Aarau

2019 · https://www.eurallpress.de/ei

Pagliari, Gerber, Hertweck

Meshfree Simulation of Problems in Soil Mechanics

2018 · Universität Innsbruck, Dissertation 2018, https://resolver.obvsg.at/urn:nbn:at:at-ubi:1-27650

I. Bathaeian

Validation of longitudinal displacement profiles by measurement at the Brenner Base Tunnel

2018 · 2018 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin · Geomechanics and Tunnelling 11 (2018), No. 5

B. Schneider-Muntau, C. Reinhold, T. Cordes, I. Bathaeian, K. Bergmeister

Simulation of settlement and bearing capacity of shallow foundations with soft particle code (SPARC) and FE

2018 · GEM - International Journal on Geomathematics (2018) 9:359–375 https://doi.org/10.1007/s13137-018-0109-z

B. Schneider-Muntau, I. Bathaeian

Tunnelling Studies for CERN’s Future Circular Collider

2018 · World Tunnel Congress 2018, 21-26 April, Dubai

J. Osborne, J. Stanyard, L. Ariza, W. Dallapiazza

New studies on New Energy Carriers

2018 · Norwegian Tunnel Safety Conference, Stavanger, Norway, June 18th – 19th 2018

M. Wietek

ILF Consulting Engineers: Die Denkfabrik aus Tirol

2018 · SI - Seilbahn International, Issue 2/2018, Page 62-63

ILF Consulting Engineers

Backstage bei ILF

2018 · SI - Seilbahn International, Issue 6/2018, Page 50-51

ILF Consulting Engineers

Erlebnis Bergsommer planen

2018 · Mountain Manager 4/2018

ILF Consulting Engineers

Energy Highways, Large-scale DC Grid deployments

2018 · Project Management Symposium, 18-19/12/2018, Riyadh

M. Erath

Utility Base and Distributed Renewable Energy, Project Design and Management

2018 · Project Management Symposium, 18-19/12/2018, Riyadh

M. Erath

Schneeanlagenplanung 4.0

2018 · Mountain Manager 3/2018, page 78-79

ILF Consulting Engineers

Multi-Layer Shotcrete Design for Tunnel Construction

2018 · Shotcrete for Underground Support XIII: New Developments in Rock Engineering, Tunneling, Underground Space and Deep Excavation

B. Mattle, W. Summerer, S. Höser, V. Bartos

Effectiveness of Risk Mitigation Measures for Road Tunnels

2018 · Routes/Roads 2018 - Nr. 378 - www.piarc.org

B. Kohl

Effectiveness of Risk Mitigation Measures for Road Tunnels

2018 · Routes/Roads 2018 - Nr. 378 - www.piarc.org

B. Kohl

Light as a warning system

2018 · World Pipelines / Extreme 2018

M. Pimentel Nino

Light as a warning system

2018 · World Pipelines / Extreme 2018

M. Pimentel Nino

Rehabilitation of the Mud Mountain Bypass Tunnel Invert

2018 · ICOLD World Congress 2018

C. Auel, R. Thene, J, Carroll, C. Holmes, R. M. Boes

Rehabilitation of the Mud Mountain Bypass Tunnel Invert

2018 · ICOLD World Congress 2018

C. Auel, R. Thene, J, Carroll, C. Holmes, R. M. Boes

Sediment Bypassing – A sustainable and eco-friendly strategy against reservoir sedimentation

2018 · ICOLD World Congress 2018, Innovation Awards

C. Auel

Sediment Bypassing – A sustainable and eco-friendly strategy against reservoir sedimentation

2018 · ICOLD World Congress 2018, Innovation Awards

C. Auel

Rockfall in the Port Hills of Christchurch: Seismic and non-seismic fatality risk on roads

2018 · New Zealand Geographer (2018) 74, Page 3–14

S. Unterrader, P. Almond, S. Fuchs

Rockfall in the Port Hills of Christchurch: Seismic and non-seismic fatality risk on roads

2018 · New Zealand Geographer (2018) 74, Page 3–14

S. Unterrader, P. Almond, S. Fuchs

Meshfree generalized finite difference methods in soil mechanics—part II: numerical results

2017 · Int J Geomath 8, 191–217 (2017). https://doi.org/10.1007/s13137-017-0096-5

I. Michel, I. Bathaeian, J. Kuhnert, D. Kolymbas, C.-H. Chen, I. Polymerou, C. Vrettos, A. Becker

Simulation of shear bands with Soft PARticle Code (SPARC) and FE

2017 · Int J Geomath (2017) 8:135–151 DOI 10.1007/s13137-016-0091-2, 2017

B. Schneider-Muntau, C-H. Chen, I. Bathaeian

A2 Sanierungstunnel Belchen – Anspruchsvolle Geologie und daraus resultierende Anforderungen

2017 · Swiss Tunnel Congress 2017, Band 16. S. 56-67 (2017)

S. Böheim, F. Chiaverio, U. Straumann

Vierspurausbau Olten – Aarau Eppenbergtunnel

2017 · Swiss Tunnel Congress 2017, Band 16. S. 30-41 (2017)

M. Hertweck, G. Pagliari

Neubau des Kraftwerkes Cotlan in der Schweiz

2017 · Wasserkraft & Energie 4/2017

M. Schwalt, M. Riehm

Dritte Belchentunnelröhre: Neue Lösungen für Vortrieb und Konstruktion beim Tunnelbau in stark quellendem Gebirge

2017 · Stuva 2017

F. Chiaverio U. Straumann S. Böheim S. Massignani

Atdorf pumped storage plant – three weeks of public discussion – a milestone in the permit application procedure

2017 · Abstract for HYDRO 2017, 9.-11. November 2017, Sevilla (Spain)

R. Fritzer, E. Manninger, M. Fink, U. Gommel

Atdorf pumped storage plant – three weeks of public discussion – a milestone in the permit application procedure

2017 · Abstract for HYDRO 2017, 9.-11. November 2017, Sevilla (Spain)

R. Fritzer, E. Manninger, M. Fink, U. Gommel

Multi-Layer Shotcrete Design for Tunnel Construction

2017 · Shotcrete for Underground Support XIII: New Developments in Rock Engineering, Tunneling, Underground Space and Deep Excavation, 3.-6. September 2017, Irsee, Germany

B. Mattle, W. Summerer, S. Höser, V. Bartos

Multi-Layer Shotcrete Design for Tunnel Construction

2017 · Shotcrete for Underground Support XIII: New Developments in Rock Engineering, Tunneling, Underground Space and Deep Excavation, 3.-6. September 2017, Irsee, Germany

B. Mattle, W. Summerer, S. Höser, V. Bartos

Decentral Hydrogen Production from Renewable Energy for the Mobility Sector

2017 · ÖGEW/DGMK Autumn Conference in Vienna, Austria, 2017

M. Kneller, J. Kottsieper, P.Zarzycki, M.Tomczyński

Decentral Hydrogen Production from Renewable Energy for the Mobility Sector

2017 · ÖGEW/DGMK Autumn Conference in Vienna, Austria, 2017

M. Kneller, J. Kottsieper, P.Zarzycki, M.Tomczyński

Bewertungsmodelle zur Gewährleistung eines sicheren Bahnbetriebs in der Zukunft

2017 · ETR Austria, Heft Juni 2017, Nr. 6, Seite 82-86, Website: www.eurailpress.de/etr.

F. Diernhofer, G. Berger-Boyer, W. Frenzl

Bewertungsmodelle zur Gewährleistung eines sicheren Bahnbetriebs in der Zukunft

2017 · ETR Austria, Heft Juni 2017, Nr. 6, Seite 82-86, Website: www.eurailpress.de/etr.

F. Diernhofer, G. Berger-Boyer, W. Frenzl

GIS-gestützte Raumwiderstandsanalyse am Beispiel „SuedLink“

2017 · 3R International, Heft 06, Seite 86-90, 2017

W. Wakolbinger

GIS-gestützte Raumwiderstandsanalyse am Beispiel „SuedLink“

2017 · 3R International, Heft 06, Seite 86-90, 2017

W. Wakolbinger

Ensuring hazards don’t cause HAVOC

2017 · World Pipelines, issue May 2017

G. Amaya, M. Guerra, J. Cubillos, O. Mercado, M. Kasch, T. Rother

Ensuring hazards don’t cause HAVOC

2017 · World Pipelines, issue May 2017

G. Amaya, M. Guerra, J. Cubillos, O. Mercado, M. Kasch, T. Rother

Mean flow and turbulence variation due to invert abrasion

2017 · Proceedings of the 2nd International Workshop on Sediment Bypass Tunnels (T. Sumi ed.), FP15, Kyoto University, Kyoto, Japan, 2017

C. Auel, M. Sanjou, T. Okamoto, S. Kobayashi, T. Sumi

Mean flow and turbulence variation due to invert abrasion

2017 · Proceedings of the 2nd International Workshop on Sediment Bypass Tunnels (T. Sumi ed.), FP15, Kyoto University, Kyoto, Japan, 2017

C. Auel, M. Sanjou, T. Okamoto, S. Kobayashi, T. Sumi

Abrasion prediction at Mud Mountain sediment bypass tunnel

2017 · Proceedings of the 2nd International Workshop on Sediment Bypass Tunnels (T. Sumi ed.), FP12, Kyoto University, Kyoto, Japan, 2017

C. Auel, J. Thene, M. Müller-Hagmann, I. Albayrak, R. Boes

Abrasion prediction at Mud Mountain sediment bypass tunnel

2017 · Proceedings of the 2nd International Workshop on Sediment Bypass Tunnels (T. Sumi ed.), FP12, Kyoto University, Kyoto, Japan, 2017

C. Auel, J. Thene, M. Müller-Hagmann, I. Albayrak, R. Boes

Sedimentumleitstollen – eine nachhaltige Maßnahme gegen Stauraumverlandung

2017 · WasserWirtschaft, Heft 4/2017, Seite 42 - 47, 2017

C. Auel, R. Boes

Sedimentumleitstollen – eine nachhaltige Maßnahme gegen Stauraumverlandung

2017 · WasserWirtschaft, Heft 4/2017, Seite 42 - 47, 2017

C. Auel, R. Boes

Regional Tram Projects in Upper Austria – Taylor-made Solutions for Passengers

2017 · 13th FORUM OF RAIL TRANSPORT in Bratislava, 14. - 15. März 2017

B. Kohl, K. Hölzl

Pipeline Monitoring and the Blue Colour of the Sky

2017 · Pipeline Technology Conference 2017, Berlin

M. Pimentel Nino

Interview with the Executive Vice President of ILF Consulting Engineers (Bernhard Lässer)

2016 · SOUQ - Das Ghorfa-Wirtschaftsmagazin, Issue 3/2016

SOUQ - Das Ghorfa-Wirtschaftsmagazin

Mit Energiemix die Zukunft gestalten

2016 · SOUQ - Das Ghorfa-Wirtschaftsmagazin, Heft 4/2016, Seite 13-16, 2016

SOUQ - Das Ghorfa-Wirtschaftsmagazin

Erschütterungsschutz bei Unterwassersprengungen am Beispiel des Niagara Tunnels

2016 · 47. Internationale Informationstagung für Sprengtechnik, 10.-11. November 2016, Linz

P. Steinhauser, M. Ristic

Ausführung des Luftblasenvorhanges beim Niagara Tunnel Project

2016 · Dynamik Tage Wien 2016, 6.–7. Oktober 2016

P. Steinhauser, M. Ristic

Lebenszykluskostenanalyse von Instandsetzungsmaßnahmen an Brückenbauteilen

2016 · 2. Brückenkolloquium, Beurteilung, Ertüchtigung und Instandsetzung von Brücken, Ostfildern, 21.-22. Juni 2016

F. Binder, U. Grunicke

Gwadar – Nawabshah Pipeline Development of a Project

2016 · 3R International, Special Edition 01, page 72 - 75, 2016

H. Lohrenscheit

Conflict management in the process of impact assessment

2015 · IAIA15 Conference, Annual Conference of the International Association for Impact Assessment in Florence, 2015, Italy

R. Bergmüller

Wasser- und Abwasserprojekt Korca – Vorzeigeprojekt in Albanien nach 15 Jahren erfolgreich abgeschlossen

2015 · Korrespondenz Abwasser, Abfall, Heft 12, Seite 1100 - 1105, 2015

T. Fritz, T. Reinheimer

Automated Design – BIM im Rahmen eines Pipelineprojekts

2015 · IPDC Kongress 2015, Universität Innsbruck - Fakultät für Technische Wissenschaften, Campus Technik, 19.-20. November 2015

O. Pape, D. Correoso

Estimation of soil characteristics for design of large earth-fill dams: challenges and solutions at an early design stage: case study of the Atdorf pumped storage plant

2015 · HYDRO 2015 Advancing Policy and Practice, Bordeaux, France, Aqua-Media International Ltd (Organizer), 26.-28. Oktober 2015

F. Remmert, C. Prager, L. Schwarz, M. Knieper

Niagara Tunnel Project – Hydraulic Aspects

2015 · HYDRO 2015 Advancing Policy and Practice, Bordeaux, France, Aqua-Media International Ltd (Organizer), 26.-28. Oktober 2015

R. Fritzer, E. Gschnitzer

The role of the Southern Gas Corridor

2015 · World Pipelines, Heft August, Page 25 - 28, 2015

S. Buerkle, C. Huebner

Common Seawater Supply Project, Enabling one of the world’s top oil producing regions

2015 · Pipeline Technology Journal, Seite 46 - 48, 2015

T. Walk

Desalination and Advance Water Treatment Economics and Financing

2015 · Sommariva C.:

C. Sommariva

G‐VOLUTION II; Zweibettwirbelschicht Biomasse‐Dampfvergaser der zweiten Generation

2015 · Klima- und Energiefond:Neue Energien 2020 - publizierbarer Endbericht ( Technische Universität Wien, Tecon Engineering GmbH, 2015)

J. Schmid, S. Müller, M. Kolbitsch, W. Tesch, H. Hofbauer

A selection guide for leak detection systems

2015 · World Pipelines, Volume 15 Number 2 - February 2015, Seite 73 - 78

Dr. M. Kasch

Safety standards of modern railway lines in Europa – decision making with risk-based approach

2015 · SRT (State Railway of Thailand) – Seminar, 19th-23th of January 2015, Bangkok

F. Diernhofer

Engineering excellence

2014 · European Oil & Gas, Issue 115, Final, Seite 82 - 83

T. Walk

How frequent are fires in tunnels – Analysis from Austrian Tunnel Incident Statistics

2014 · 7th International Conference ‘Tunnel Safety and Ventilation’ 2014, Graz, Seite 5 - 11

G. Rattei, A. Lentz, B. Kohl

With High-Speed to a safe emergency handling – Vienna-St. Pölten Tunnel High-Speed Line

2014 · 7th International Conference ‘Tunnel Safety and Ventilation’ 2014, Graz, Seite 20 - 27

F. Diernhofer, C. Sommerlechner, B. Fößleitner

Upgrading of the Austrian Tunnel Risk Model Turismo – Methodocial and Practical Aspects

2014 · 7th International Conference ‘Tunnel Safety and Ventilation’ 2014, Graz, Seite 170 - 179

B. Kohl, C. Forster, S. Wiesholzer

Geologisch-geotechnischer Planungsprozess von Tunnelbauten

2014 · Beton-Kalender 2014, Ernst & Sohn GmbH & Co. KG, Seite 39-62, 2014

A. Kirsch, T. Marcher

Geologisch-geotechnischer Planungsprozess von Tunnelbauten

2014 · Beton-Kalender 2014, Ernst & Sohn GmbH & Co. KG, Seite 39-62, 2014

A. Kirsch, T. Marcher

Organisatorische Randbedingungen bei der Abwicklung von Projekten mit BIM

2014 · IPDC Kongress 2014, Universität Innsbruck - Fakultät für Technische Wissenschaften, Campus Technik, 20.-21. November 2014

O. Pape

Speicher mit Großwärmepumpe

2014 · ZfK - Zeitschrift für kommunale Wirtschaft, August 2014, Seite 19

R. Große

Einige Gedanken zur Energiewende in Deutschland

2014 · XX0401-ILFM-AD-0104

A. Feizlmayr

Using the Linear Risk Integral (LRI) approach in pipeline QRA for a better application of risk mitigation measures

2014 · Pipeline Technology Journal, May 2014, Seite 38-45

Dr. U. Neunert

Tunnel Untersammelsdorf – erweiterte Planungsstrategie für Stützmaßnahmen im „Seeton“

2014 · 29. Christian Veder Kolloquium Graz, 24.-25. April 2014

R. Heissenberger, J. Benedikt, G. Mauerhofer

The early stage of design – key to a successful rail project

2014 · 10th Forum of Rail Transport, Int. Conf. , 18th – 19th March 2014, Bratislava

B. Kohl, G. Leitner

A leading consultant

2014 · European Oil and Gas Magazine, Early Edition, Issue 107, Seite 100-101

H. Hoeft

Public participation in the EU – a comparison between East and West

2013 · IAIA13 Conference, May 13-16, 2013, Calgary / Canada (www.iaia.org)

J. Baer-Pásztory, R. Bergmüller

Some aspects on the design of near surface tunnel – theory and practice

2013 · 6th Colloquium

T. Marcher, T. Aydogmus

A Fault Zone Management for Deep Seated Tunnels

2013 · Österreichische Gesellschaft für Geomechanik, Workshop 09.10.2013, Salzburg

U. Burger, T. Marcher, E. Saurer, L. Soldo

A Method for Prediction of Gas/Gas Ejector Performance

2013 · Impiantistica Italiana, Sept./Okt. 2013, Seite 75-80

D. Ercolani, P. van Eeden

Atdorf pumped-storage plant: permitting requirements of a large-scale project in Germany

2013 · HYDRO Konferenz 2013, Innsbruck/Austria, 7.-9. Oktober 2013(originally published in the HYDRO 2013 Proceedings)

M. Fink, R. Fritzer, M. Pehm

Design and verification challenges of hydropower plant caverns

2013 · HYDRO Konferenz 2013, Innsbruck/Austria, 7.-9. Oktober 2013(originally published in the HYDRO 2013 Proceedings)

T. Marcher, E. Saurer

Kraftwerk Kirchbichl – Erweiterung

2013 · Hydro zek, Ausgabe August 2013, Seite 73 - 75

A. Dengg, A. Heel

Deformation measurement and long-term behaviour of passively prestressed pressure tunnels through the example of the Niagara Tunnel Facility Project

2013 · Geomechanik und Tunnelbau, Heft 5, Seite 398 - 406, 2013

H. Krenn, M. Roner, M. Bauert, H. Wannenmacher

Kläranlage Czajka in Warschau fertiggestellt

2013 · wasserwirtschaft wassertechnik, Ausgabe 4/2013, Seite 16 - 19, www.wwt-online.de

M. Serafin, W.van Appeldorn

Decisive design basis and parameters for power plant caverns

2013 · ITA-AITES World Tunnel Congress, WTC 2013, Geneva

E. Saurer, T. Marcher, M. John

Design and verification challenges of the Limmern caverns

2013 · ITA-AITES World Tunnel Congress, WTC 2013, Geneva

T. Marcher, M. John, J.-M. Hohberg, D. Fellner, K. Blank, R. Marclay

Gotthard Base Tunnel – 3-dimensional numerical calculations for part of the Clavaniev Zone considering geotechnical measurement data

2013 · ITA-AITES World Tunnel Congress, WTC 2013, Geneva

C. Volderauer, R. Galler, T. Marcher

Overcoming Rock Squeeze and Overbreak in a large Diameter TBM Excavation

2013 · ITA-AITES World Tunnel Congress, WTC 2013, Geneva

U. Grunicke, M. Ristic, D.F. Wood

Trassenauswahl im Spannungsfeld der Interessen

2013 · Festschrift Technische Universität Wien, 2013

B. Kohl

A dense pipeline network guarantees our energy supply

2013 · Herrenknecht Magazin, Seite 24 - 25, 2013

B. Lässer

Safety in road tunnels – state of the art

2013 · 12th International Conference

B. Kohl

Modelling of input data uncertainty for the financial evaluation of complex infrastructure projects

2013 · Bauingenieur, Ausgabe 2, Seite 78-88, 2013

M. Beisler, H. Klapperich, D. Jacob, H. Schweiger

Fully comprehensive – Leistungsspektrum der ILF am Beispiel Gasspeicher und anderer Öl- und Gasprojekte

2013 · European Oil & Gas, Issue One 2013, Seite 97-98

R. Szczepanek

Reputation based cooperation in the ESIA process

2012 · IAIA12 Conference, 32nd Annual Meeting of the International Association for Impact Assessment, 27 May- 1 June 2012, Portugal (www.iaia.org)

R. Bergmüller, C. Narval

Application of a constitutive model for swelling rock to tunnelling

2012 · Geotechnical Engineering Journal of the SEAGS & AGSSEA Vol. 43, No.4, December 2012

B. Schädlich, T. Marcher, H.F. Schweiger

3-Dimensional Numerical Calculations Considering Geotechnical Measurement Data

2012 · BHM Berg- und Hüttenmännische Monatshefte, Seite 1 - 8, 2012

C. Volderauer, T. Marcher, R. Galler

Energieeffiziente Maßnahmen zur Abwärmenutzung und Stromerzeugung bei Verdichterstationen und Erdgasspeicher als zukunftsweisende Technik

2012 · 3R International, 11-2012, Seite 898-904

S. Zacherl, S. Grill

Fallstudie Niagara Tunnel Facility Project: Technische und wirtschaftliche Aspekte passiv vorgespannter Druckstolle (A Case Study of the Niagara Tunnel Facility Project: Technical and economical aspects of passive prestressed pressure tunnels)

2012 · Swiss Tunnel Congress, Luzern, Seite 276 - 299, 13.06.2012

H. Wannenmacher, H. Krenn, N. Komma, M. Bauert, U. Grunicke

SCADA Upgrade Potentials

2012 · World Pipelines, October 2012, Seite 18-24

J. Frings

Vortriebsarbeiten für den Brennerbasistunnel im Raum Innsbruck

2012 · Pangeo Austria Tagung, Salzburg, 17.09.2012

F. Stackler, K. Wendl, C. Nemec, M. Keinprecht

Value Engineering Approach to Increase Cost Efficiency

2012 · 3R Special-Edition 2/2012, Seite 50-53

T. Walk

Pre-stressed tunnel lining – pushing traditional concepts to new frontiers

2012 · World Tunnel Congress WTC 2012 in Bangkok, May 18 - 23, 2012

B. Mattle, U. Grunicke

Der Ausbau des Pumpspeicherwerks Vianden

2012 · Österreichische Bautechnik Vereinigung - Betontag 2012, Seite 160ff, 2012

M. Heinemann

Cyber-attack protection for pipeline SCADA systems

2012 · Pipelines International Digest, January 2012, Seite 5-8

T. Walk

Auswirkungen der Berücksichtigung der Temperaturerhöhung im Brandfall auf die Dimensionierung von quergelüfteten Straßentunnel

2011 · Bundesministeriums für Verkehr, Innovation und Technologie, 2011

P. Sturm, B. Höpperger

Design of a pipeline rehabilitation including the modern approach of PIMS and RMS

2011 · gwf international, Issue 2-2011, Seite 110-113

M. Rieder, A. Louwerse

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

Explore Careers
Brochures - ILF Consulting Engineers