Skip to content

Battery Energy Storage System for a Photovoltaic Power Plant for Refugee Camp

The Ministry of Energy and Mineral Resources has commissioned the building of a photovoltaic power plant in the Al-Jizeh district. A Battery Energy Storage System (BESS), which includes battery cells, bidirectional inverters and a transformer, has been connected to the distribution network.
Energy & Climate ProtectionHybrid PowerSolar PowerEnergy Storage
Client:
Ministry of Energy and Mineral Resources (MEMR), Kreditanstalt für Wiederaufbau (KfW)
Location:
Jordan
Time frame:
2017–ongoing
  • Total inverter capacity: 3,636 kVA
  • Battery capacity upon commissioning: 2,624 kWh
  • Transformer: 4.0 MVA, 0.69 kV / 33 kV
  • Pre-assembled 40 ft high-cube container, housing the battery modules
    and balance of system components (e.g. HVAC system, fire detection system, etc.)
  • Management Consulting
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Battery Energy Storage System for a Photovoltaic Power Plant for Refugee Camp