Nam Ngone 2 Hydropower Project

The project consists of four run-of-the-river hydroelectric power plants. Pre-feasibility studies were then carried out for the two leading HPPs. The studies included the preparation of a conceptual design, site visits, energy and cost estimates and a financial evaluation of the projects.
Energy & Climate Protection
Client:
Rendcor GmbH, Austria
Location:
Lao PDR
Time frame:
2017 - 2018
  • Installed Capacity: 25.2 MW
  • Design Flow: Two Intakes with 3.6 m3/s and 2.33 m3/s
  • Design Head: 519.4 m
  • Headworks: Weir with lateral intake, Tyrolean weir with attached desander
  • Waterway: Concrete lined Free Flow Canal
  • Powerhouse: 2 Pelton Turbines
  • Management Consulting
  • Engineering

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Nam Ngone 2 Hydropower Project