Skip to content

A9 Pyhrn Motorway, Wald Tunnel, Live Fire Tests

In addition to providing site supervision services for an approx. 2,850 m long twin-tube tunnel with a longitudinal ventilation system, ILF also performed live fire tests during tunnel commissioning.
Client:
ASFINAG Bau Management GmbH, Vienna
Location:
Austria
Time frame:
2015–2018
  • Twin-tube tunnel with one-way traffic
  • Length: approx. 2,850 m
  • Retrofitting of escape routes
  • Construction of additional emergency call and firefighting niches
  • Renewal and adaptation of power supply
  • Installation of high-pressure water mist system
  • Renewal of the tunnel ventilation system
  • Management Consulting
  • Engineering
  • Project Management

Start Your Next Engineering Project with Us

Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

Contact Us

Start Your Next Career Steps with Us

Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

Explore Careers