
Overview
Nam Kong 2 Hydropower Project
About the Project
- Client:
- Chaleun Sekong Group Co. Ltd.
- Location:
- Lao PDR
- Time frame:
- 2015 - 2017
Technical Data
- Installed Capacity: 66 MW
- Design Flow: 76.2 m3/s
- Design Head: 98.9 m
- Headworks: Concrete gravity dam (height 50 m, crest length 210 m)
- Powerhouse: 2 Francis Turbines
ILF-Services
- Engineering
- Project Management
References







