Overview
Nam Mo 1 Hydropower Project
About the Project
- Client:
- Confidential
- Location:
- Lao PDR
- Time frame:
- 2015 - 2017
Technical Data
- Installed Capacity: 60 MW
- Design Flow: 65 m³/s
- Headworks: Concrete Gravity Dam (height: 18 m; crest length 91 m)
- Waterway: 5.4 km, Tunnel
- Powerhouse: 3 Francis Turbines
ILF-Services
- Management Consulting
- Engineering
References