Skip to content

Stanzertal Hydropower Plant

Over a length of 5,300 m the Stanzertal hydropower plant uses part of the discharge of the Rosanna river. Along this river section, the Rosanna has a usable head of about 141 m. In the course of an average year, the electric power generated by the Stanzertal hydropower plant amounts to 52 million kWh.
Energy & Climate ProtectionHydropowerTunnelsBuildings
Client:
INFRA Project Development GmbH
Location:
Austria
Time frame:
2010–2015
  • Installed capacity: 13.5 MW
  • Design flow: 12 m³/s
  • Head: 141 m
  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers