Overview
Chittagong Refinery Import Terminal and Offshore Pipelines
About the Project
- Client:
- Eastern Refinery Limited / Bangladesh Petroleum Corporation
- Location:
- Bangladesh
- Time frame:
- 2011 - 2022
Technical Data
- Unloading facility: SPM
- Max. ship size: 120,000 DWT
- Max. water depth: 30 m
- Tank farm:
Crude oil: 150,000 m³
Diesel oil: 90,000 m³ - Unloading lines: 2 × 36”
(9 km offshore, 7 km onshore) - Delivery lines: 2 × 18”
(64 km offshore, 30 km onshore) - Pumpstation, metering stations
ILF-Services
- Engineering
- Project Management