


Overview
Gwadar–Nawabshah Gas Pipeline
About the Project
- Client:
- ISGS Inter State Gas Systems (Pvt) Ltd.
- Location:
- Pakistan
- Time frame:
- 2011–2018
Technical Data
- Medium: natural gas
- LNG terminal in Gwadar
- Length: 782 km
- Diameter: 42”
- Max. operating pressure: 94.6 barg
- Capacity: 15 bcm/a (initial stage: 5 bcm/a)
- No. of compressor stations: 3 (final stage)
ILF-Services
- Management Consulting
- Engineering
- Project Management
References







