Nam Hkok Hydropower Project

The project is located on Myanmar’s Nam Hkok River, which is the upper reach of the Kok River, a primary right-hand tributary to the Mekong. The Nam Hkok HPP is a dam toe hydropower plant with a certain monthly regulating capacity (live storage capacity of 153.2 MCM). The project is designed on feasibility level as a concrete gravity dam with a maximum height of 80.8 m and is expected to generate around 286 GWh/a with a guaranteed minimum output of 12.57 MW
Energy & Climate Protection
Client:
Natural Current Energy Hydropower Co., Ltd
Location:
Myanmar
Time frame:
2022
  • Installed Capacity: 60 MW (3 x 20 MW)
  • Design Discharge:114,6 m3/s (3 x 38.2 m3/s)
  • River diversion: reinforced concrete conduits (2 x 5 m x 5 m), length 443 m, design discharge 700 m3/s
  • Dam: Concrete gravity dam, height 48 m, dam crest elevation 53.34 masl, crest length 534 m
  • Transmission line: 164 km @ 132 KV
  • Powerhouse: Semiunderground 3 vertical Francis units
  • Management Consulting
  • Engineering
  • Project Management

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Nam Hkok Hydropower Project