Skip to content

New Construction of Railway Overpass across the B26 Federal Road, Hanau–Nantenbach Railway Line

The rail overpass across the B26 federal road comprises two single-track integral (monolithic) bridges with curved lower edge and lengths of approx. 32 m. The bridges are dimensioned for a design speed of some 160 km/h.
Transportation & Urban SpacesRoadsRailwaysBridges
Client:
ARGE Umfahrung Schwarzkopftunnel
Location:
Germany
Time frame:
2013-2016
  • 2 single-track integral (monolithic) bridges (reinforced concrete frame structures
  • Center line distance: 10.5 m with curved lower edge
  • Length: approx. 32 m
  • Design speed: ≤ 160 km/h
  • Engineering

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers