
Overview
Pakbeng Hydropower Project
About the Project
- Client:
- Department of Energy Business (DEB), Min-istry of Energy and Mines, Government of Laos
- Location:
- Lao PDR
- Time frame:
- 2017 - 2018
Technical Data
- Installed Capacity: 912 MW
- Design Flow: 5,771 m3/s
- Design head: 18 m
- Headworks: Concrete Gravity dam with 69 m height and 896 crest length
- Powerhouse: 16 Bulb Turbines
ILF-Services
- Management Consulting
- Engineering
References







