Skip to content

Abu Dhabi Crude Oil Pipeline

The pipeline ties into the existing ADCOP system at MP21 and runs from Habshan (main pumping station) via Sweihan (intermediate pumping station) to the terminal in Fujairah. It serves as additional export route for crude oil bypassing the Strait of Hormuz.
Resources & Sustainable IndustryPipelines
Client:
International Petroleum Investment Company (IPIC)
Location:
United Arab Emirates
Time frame:
2007–2014
  • Length: 403 km
  • Diameter: 48”
  • Pump discharge pressure: 90 bar
  • Capacity: 1.5 mmbpd
  • 2 pumping stations (total installed power: 68 MW),
    terminal with 8 tanks,
    working capacity: 160,000 m³/each,
    loading facilities (total installed power:
    32 MW)
  • 1 pressure reducing station
  • Offshore loading lines 3 × 5 km
  • 3 single point moorings
  • Management Consulting
  • Project Management
  • Engineering

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers