


Overview
Trans Anatolian Natural Gas Pipeline Project (TANAP)
About the Project
- Client:
- TANAP
- Location:
- Türkiye
- Time frame:
- 2012–2018
Technical Data
- Length: 1,800 km
- Extremely challenging terrain
- Diameters: 56″ and 48″
- Throughput: 31 bcm/a
- 7 compressor stations, 11 pigging stations
- 4 metering stations, 49 block valve stations
ILF-Services
- Management Consulting
- Project Management
- Engineering
References







