


Overview
Puchkirchen Gas Storage Plant
About the Project
- Client:
- RAG Rohöl-Aufsuchungs AG
- Location:
- Austria
- Time frame:
- 2006–2007
Technical Data
- Working gas volume: 500 million Sm³
- Increase of input/output capacity
from 290,000 Sm³/h to 520,000 Sm³/h - Additional compressor train with gas turbine drive (10 MW)
- Additional gas dryer in satellite station I
- Integration of Haag satellite station as gas storage facility
- 5 additional storage wells
ILF-Services
- Project Management
- Engineering
References







