Overview
Combined Cycle Power Plant and Transmission Line
About the Project
- Client:
- Hansworth Limitied
- Location:
- Nigeria
- Time frame:
- 2015–2016
Technical Data
- 2800 MW IPP connected to the 330 kV grid
- Study for the evacuation of power into the primary grid of Nigeria
(330 kV/132 kV OHTL), taking into account consumers and plants on both voltage levels
ILF-Services
- Management Consulting