
Overview
Huaphan Hydropower Project
About the Project
- Client:
- Confidential
- Location:
- Lao PDR
- Time frame:
- 2015 - 216
Technical Data
- Installed Capacity: 6.9 MW, 4.3 MW, 6.0 MW, 4.6 MW
- Design Flow: 9 m³/s, 2.3 m³/s, 6.5 m³/s and 11.9 m³/s
- Design Head: 50 m, 245 m, 134 m and 29 m
- Waterway: 5.4 km (total), Tunnel
- Powerhouse: Francis Turbines
ILF-Services
- Management Consulting
- Engineering
References







