Nam Emoun Physical Hydraulic Model Hydropower Project

As a result of ILF's redesign and Owner's Engineer con-tract for the Nam Emoun hydropower project, the scope was extended by an additional project which included the preparation and supervision of a physical hydraulic model for the main structures of the project:
Energy & Climate Protection
Client:
Confidential
Location:
Lao PDR
Time frame:
2019 - 2022
  • Installed Capacity: 131.5 MW
  • Design Flow: 37 m3/s
  • Design Head: 396.4 m
  • Headworks: 2 Gate weirs concrete weirs (height 28 m, crest length 45 m) with lateral intake
  • Waterway: Two converging pressurized tunnels with a total length of 20 km
  • Powerhouse: 2 x vertical Pelton turbines

  • Management Consulting
  • Engineering

Proven Impact Through Real-World Projects

Explore selected projects that demonstrate our expertise in delivering complex energy and infrastructure solutions worldwide.

    Start Your Next Engineering Project with Us

    Partner with our experts to deliver complex infrastructure, energy, and environmental projects with precision and long-term impact.

    Contact Us

    Start Your Next Career Steps with Us

    Join our team and help shape sustainable solutions for the infrastructure and energy challenges of tomorrow.

    Explore Careers
    Nam Emoun Physical Hydraulic Model Hydropower Project