
Overview
Nam Emoun Physical Hydraulic Model Hydropower Project
About the Project
- Client:
- Confidential
- Location:
- Lao PDR
- Time frame:
- 2019 - 2022
Technical Data
- Installed Capacity: 131.5 MW
- Design Flow: 37 m3/s
- Design Head: 396.4 m
- Headworks: 2 Gate weirs concrete weirs (height 28 m, crest length 45 m) with lateral intake
- Waterway: Two converging pressurized tunnels with a total length of 20 km
Powerhouse: 2 x vertical Pelton turbines
ILF-Services
- Management Consulting
- Engineering
References







